G i d e o n
A  r  c  h  i  t  e  c  t  s
 

Home

Projects

All Faiths Chapel

Christ Episcopal

First Congregational

Hillcrest Chapel

Immanuel Bible Church

St. Hilda's & St. Patrick's

St. Paul's Episcopal

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Churches

2002

2001-

 

HILLCREST CHAPEL Addition and Alterations, Bellingham, WA

25,506 SF 2 1/2 Story Steel Frame Addition, New Worship Space, Offices, and Education Center; 16,757 SF 2 Story Wood Frame Alterations, Convert Worship Space into

Multi-Purpose Rooms and Remodel Education Space; 

Programming, Design through Construction Documents; Under Construction;  

Estimated Cost $3.1M; Design and Principal Architect

2002-

2000

 

CHRIST EPISCOPAL CHURCH Undercroft Remodel, Seattle, WA

Remodel of Undercroft/Banquet Room, Choir Room, Meeting Room and Restrooms. Addition of table/chair storage room and kitchen storage room;

Design through Construction Documents; In Progress; Design and Project Architect

2001

SEATTLE VIETNAMESE CHRISTIAN CHURCH, Seattle, WA; Feasibility Study

1999   

1996-

 

ST. HILDA'S and ST. PATRICK'S EPISCOPAL CHURCH, Edmonds, WA

5,200 SF Worship Space and Kitchen Addition, Remodel Worship space into Parish Hall;   

Master Plan, Design through Construction Administration Cost $1.13M;

Design and Principal Architect 

1996

1994-

 

Historic ST. PAUL'S EPISCOPAL CHURCH Addition and Remodel, Bellingham, WA

21,000 SF Addition, 7,000 SF Remodel; Three story wood frame, brick veneer construction; Administrative Offices, Chapel, Church School, used by Head Start during weekdays, Commercial Kitchen, Meeting and Work Rooms, Parish Hall including mini Gymnasium, Pre-K and K-2 Parochial School. Programming and Planning through Construction Documents and Contractor Negotiations; Designer and Project Architect with John Stewart Architects; Programming and Construction Administration; Cost: $1.9M; Principal Architect

1988   

1987-

 

Historic ST. MARY'S CATHOLIC CHURCH, Stockton, CA

 8,628 SF Restoration and Rehabilitation, 1.5 Story Brick Construction;

Masterplanning through Construction Documents; Phase 1 Restoration: Construction Administration; Estimated Cost: $276,000; Phase 1 Cost: $38,226; Principal Architect  

1997

SILVERCREST Chapel, Stockton, CA

The Salvation Army Corps

Part of SILVERCREST Elderly Housing; Schematic Design; Principal Architect

1986 

COMMUNITY CENTER with Chapel, Bakersfield, CA

The Salvation Army Corps

19, 738 SF 1 Story and Playfields;  Feasibility Study & Schematic Design; Principal Architect

 

FIRST CHRISTIAN CHURCH, Stockton, CA

3,000 SF conversion of 1 story wood frame office building into Nave/Sanctuary, Fellowship Hall, and Church Offices; Programming and Planning through Construction Administration;  Cost: $80,000; Principal Architect

1985 

Historic FIRST CONGREGATIONAL CHURCH, Stockton, CA

Toilets and Ramp Accessibility Addition and Remodel; Constructed;

Cost: $15,000; Principal Architect

1984 

LDS FIRST and SECOND WARD CHURCH, Stockton, CA

Re roof; Construction Documents; Technical Architect with Mortensen/Gideon Architects

1983

COMMUNITY CENTER with Chapel, Stockton, CA

The Salvation Army Corps

10,368 SF Addition, 7,202 SF Remodel: Nave/Sanctuary, Multi-use Overflow, Multi-use Classrooms, Multi-use Gymnasium, Activity Rooms, and Courtyards; 1 story Masonry and wood frame constructionProgramming and Planning through Construction Administration; Cost: $750,000; Constructed

Principal Architect with Mortensen/Gideon and Associates

 

LDS CHURCH, Brentwood, CA

1 story wood frame brick veneer construction; Technical Assistance; Cost: $1.1M;

Review Architect with Mortensen/Gideon Architects 

1981

LDS FIRST WARD CHURCH, Stockton, CA

1 story wood frame, brick veneer construction; 

Design Development and Construction Documents; Cost: $1.2M;  

Project Manager with Glen Mortensen, Architects

 

LDS CHURCH, Remodel, Elk Grove, CA

1 story wood frame construction; 

Design Development and Construction Documents; Cost: $224,932; 

Project Manager with Glen Mortensen, Architect 

 

LDS FIFTH and SIXTH WARD CHURCH Remodel, Sacramento, CA

Design Development and Construction Documents;  

Project Manager with Glen Mortensen, Architects 

 

LDS SOUTH STAKE CHURCH Remodel, Sacramento, CA

1 story wood frame construction; Technical Assistance; Cost: $61,463;

Review with Glen Mortensen, Architects

1980

LDS CHURCH Addition, Lodi, CA

1 story wood frame brick veneer construction; Technical Assistance; Cost: $368,000;

Review with Glen Mortensen Architects 

1979

LDS CHURCH, Modesto, CA

1 story wood frame brick veneer construction; Technical Assistance; Cost: $492,516;

Review  with Glen Mortensen Architects 

 

LDS FIRST and SECOND WARD CHURCH Addition and Remodel, Stockton, CA

Design Development and Construction Documents;

Project Manager with Glen Mortensen Architects

1978

LDS FIRST WARD CHURCH, Stockton, CA

Design Development and Construction Documents; 

Project Manager with Glen Mortensen Architects

 

LINCOLN PRESBYTERIAN CHURCH Remodel, Stockton, CA

Design Development and Construction Documents

Job Captain with Glen Mortensen Architects 

1974 

ALL FAITHS CHAPEL, Redfield, SD

Construction Administration; Job Captain with Synago Corporation Architects

 

 FIRST CONGREGATIONAL CHURCH Fellowship Hall Addition, Redfield, SD

Design Development through Construction Administration;

Job Captain with Synago Corporation Architects

1973 

CATHOLIC CHURCH, Wall, SD

Construction Documents;  Draftsman with Synago Corporation Architects