| G i d e o n |
| A r c h i t e c t s |
|
Churches |
|
|
2002 2001-
|
HILLCREST CHAPEL Addition and Alterations, Bellingham, WA 25,506 SF 2 1/2 Story Steel Frame Addition, New Worship Space, Offices, and Education Center; 16,757 SF 2 Story Wood Frame Alterations, Convert Worship Space into Multi-Purpose Rooms and Remodel Education Space; Programming, Design through Construction Documents; Under Construction; Estimated Cost $3.1M; Design and Principal Architect |
|
2002- 2000
|
CHRIST EPISCOPAL CHURCH Undercroft Remodel, Seattle, WA Remodel of Undercroft/Banquet Room, Choir Room, Meeting Room and Restrooms. Addition of table/chair storage room and kitchen storage room; Design through Construction Documents; In Progress; Design and Project Architect |
|
|
SEATTLE VIETNAMESE CHRISTIAN CHURCH, Seattle, WA; Feasibility Study |
|
1999 1996- |
ST.
HILDA'S and ST. PATRICK'S EPISCOPAL CHURCH, Edmonds, WA 5,200
SF Worship Space and Kitchen Addition, Remodel Worship space into Parish
Hall; Master Plan, Design through Construction Administration; Cost $1.13M; Design and Principal Architect |
|
1996 1994- |
Historic
ST. PAUL'S EPISCOPAL CHURCH Addition and Remodel, Bellingham, WA 21,000
SF Addition, 7,000 SF Remodel; Three story wood frame, brick veneer
construction; Administrative Offices, Chapel, Church School, used by
Head Start during weekdays, Commercial Kitchen, Meeting and Work Rooms,
Parish Hall including mini Gymnasium, Pre-K |
|
1988 1987-
|
Historic
ST. MARY'S CATHOLIC CHURCH, Stockton, CA 8,628 SF Restoration and Rehabilitation, 1.5 Story Brick Construction; Masterplanning through Construction Documents;
Phase 1 Restoration: Construction
|
|
1997 |
SILVERCREST
Chapel, Stockton, CA The
Salvation Army Corps Part of SILVERCREST Elderly Housing; Schematic Design; Principal Architect |
| 1986 |
COMMUNITY
CENTER with Chapel, Bakersfield, CA The
Salvation Army Corps 19, 738 SF 1 Story and Playfields; Feasibility Study & Schematic Design; Principal Architect |
|
|
FIRST
CHRISTIAN CHURCH, Stockton, CA 3,000
SF conversion of 1 story wood frame office building into Nave/Sanctuary, |
|
1985 |
Historic
FIRST CONGREGATIONAL CHURCH, Stockton, CA Toilets
and Ramp Accessibility Addition and Remodel; Constructed; Cost: $15,000; Principal Architect |
|
1984 |
LDS
FIRST and SECOND WARD CHURCH, Stockton, CA Re
roof; Construction Documents;
Technical Architect with Mortensen/Gideon Architects |
|
1983 |
COMMUNITY
CENTER with Chapel, Stockton, CA The
Salvation Army Corps 10,368 SF Addition, 7,202 SF Remodel: Nave/Sanctuary, Multi-use Overflow, Multi-use Classrooms, Multi-use Gymnasium, Activity Rooms, and Courtyards; 1 story Masonry and wood frame construction; Programming and Planning through Construction Administration; Cost: $750,000; Constructed; Principal Architect with Mortensen/Gideon and Associates |
|
|
LDS
CHURCH, Brentwood, CA 1 story wood frame brick veneer construction; Technical Assistance; Cost: $1.1M; Review Architect with Mortensen/Gideon Architects |
|
1981 |
LDS
FIRST WARD CHURCH, Stockton, CA 1 story wood frame, brick veneer construction; Design Development and Construction Documents; Cost: $1.2M; Project Manager with Glen Mortensen, Architects |
|
LDS
CHURCH, Remodel, Elk Grove, CA 1 story wood frame construction; Design
Development and Construction Documents; Project Manager with Glen Mortensen, Architect |
|
|
|
LDS
FIFTH and SIXTH WARD CHURCH Remodel, Sacramento, CA Design Development and Construction Documents; Project Manager with Glen Mortensen, Architects |
|
LDS
SOUTH STAKE CHURCH Remodel, Sacramento, CA 1
story wood frame construction; Technical
Assistance; Cost: $61,463; Review with Glen Mortensen, Architects |
|
| 1980 |
LDS
CHURCH Addition, Lodi, CA 1
story wood frame brick veneer construction; Technical
Assistance; Cost: $368,000; Review with Glen Mortensen Architects |
| 1979 |
LDS
CHURCH, Modesto, CA 1
story wood frame brick veneer construction; Technical
Assistance; Cost: $492,516; Review with Glen Mortensen Architects |
|
|
LDS
FIRST and SECOND WARD CHURCH Addition and Remodel, Stockton, CA Design Development
and Construction Documents;
Project Manager with Glen Mortensen Architects |
| 1978 |
LDS
FIRST WARD CHURCH, Stockton, CA Design Development
and Construction Documents;
Project Manager with Glen Mortensen Architects |
|
LINCOLN
PRESBYTERIAN CHURCH Remodel, Stockton, CA Design Development and Construction Documents; Job Captain with Glen Mortensen Architects |
|
| 1974 |
ALL
FAITHS CHAPEL, Redfield, SD Construction Administration; Job Captain with Synago Corporation Architects |
|
|
FIRST
CONGREGATIONAL CHURCH Fellowship Hall Addition, Redfield, SD Design Development
through Construction Administration;
Job Captain with Synago Corporation Architects |
|
1973 |
CATHOLIC
CHURCH, Wall, SD Construction Documents; Draftsman with Synago Corporation Architects |