| G i d e o n |
St. Paul's Episcopal Church Additions and Remodel 2117 Walnut Street, Bellingham Washington, 1993-1996, Cost; $1.9M |
| A r c h i t e c t s | |
|
21,442 SF Addition: Daylight Basement and two story concrete and wood frame, brick veneer construction 7,772 SF Remodel, Basement and two story concrete and wood frame, brick veneer construction 6,725 SF Limited Refurbishing: two story concrete and brick masonry construction 35,939 SF Total
New: Fellowship Hall, Church School Facilities, K-2 Primary School, Cloister and Columbarium, Remodel: Church School Facilities, Offices and Workspaces
|
|
|
|
|
|
Planning Architect: Gary R.R. Gideon, AIA: 360-676-6195 Principal Architect: John Stewart, AIA: 360-733-2100 Competition Architect: David King, AIA: 360-733-2100
Project Architect: Gary R.R. Gideon, AIA: 360-676-6195 Structural Engineering: Craig Funston, Geiger Engineers: 360-734-7194
General Contractor: Tim Spink, Exxel Pacific Corporation: 360-734-2872 Mechanical Design and Installation: David Morse, Blythe Plumbing and Heating, 360-733-7810 Electrical Design and Installation: Supreme Electric: Closed
Click here to see additional photographs
|