G i d e o n
A  r  c  h  i  t  e  c  t  s
 

Home

Projects

Bellingham High School

Blaine Athletic Park

Blaine High School

Blaine High School Gymnasium

Blaine High School Performing Arts Center

Ferndale High School Fine Arts Building

Meridian High School Multi-Use Cafetorium

Mt.Baker Junior/Senior High School

Nooksack Valley Junior/Senior High School

Woodruff Occupational Center

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  Secondary and Other School Projects
2002

ST. PAUL'S EPISCOPAL SCHOOL K-12 Facility, Northwest Site, Bellingham, WA

Feasibility Reviews: Proposed Sites and Buildings; Conditional Use Application Approved;

Principal Architect

2001

ST. PAUL'S EPISCOPAL SCHOOL K-12 Facility,  Meridian Site, Bellingham, WA

Feasibility Reviews: Proposed Sites and Buildings; Principal Architect

2002- 2000

FERNDALE HIGH SCHOOL FINE ARTS BUILDING Structural Rehabilitation, Ferndale, WA

Ferndale School District No. 502

Repair masonry deterioration and reface with water resistance material; Constructed

Cost: $190,000; Principal Architect

1999

1997-

 

 

The New BELLINGHAM HIGH SCHOOL, Bellingham, WA

Bellingham School District No. 501

166,000 SF New Addition and Reconstruction of Historic Facility, Type II and Type VI Construction; 

One, two, and three story existing reinforced concrete structure, one and two story tilt-up concrete, 

masonry and steel new construction; Administrative Areas, Classrooms, Food Service and 

Student Commons, Laboratories, Library, Physical Education and Gymnasium Facilities, Site Development, 

Theater with full fly Stage, etc.; Planning through Construction Documents; Cost: $21M;

Project Architect with ARA Architects

1997

FERNDALE ALTERNATIVE HIGH SCHOOL BUILDING 500 Renovation, Ferndale, WA

Ferndale School District No. 502

800 SF Reconstruction of one story masonry facility for Art and Vocational Classrooms;  

Programming through Construction Administration; Cost: $60,000; Project Architect with ARA Architects

1994

BLAINE HIGH SCHOOL PERFORMING ARTS CENTER Addition, Blaine, WA

Blaine School District No. 503

17,600 SF Two story masonry and steel Multi-Use Theater, Stage, Lobby and Support Spaces; 

Planning through Construction Documents; Cost:$1.7M; 

Planner and Project Architect with John Stewart Architects

 

BLAINE HIGH SCHOOL GYMNASIUM, Blaine, WA

Blaine School District No. 503

15,300 SF One and two story masonry and steel Gymnasium, Lobby and Support Spaces; 

Planning through Construction Documents; Cost: $1.2M; 

Design and Project Architect with John Stewart Architects

1993

BLAINE ATHLETIC PARK, Blaine, WA

Blaine School District No. 503

60 acre Athletic Facility: 2 baseball diamonds, 8 softball diamonds, 3 soccer/football fields, parking, 

and wetlands mitigation; Planning through Site/Civil Construction Documents; Cost: $1.1M; 

Bleachers, Concession, Interpretive Center and Maintenance structures; Masterplan

Design and Project Architect with John Stewart Architects

 

NOOKSACK VALLEY JUNIOR/SENIOR HIGH SCHOOL Additions and Remodel, Nooksack, WA

Nooksack Valley School District No. 506

34,500 SF Additions, 75,400 SF Remodel; Multiple buildings, One story wood frame, brick 

veneer, construction; Programming through Construction Administration;  Cost: $3.9M;  

Design and Project Manager/Architect with John Stewart Architects

1992

BLAINE HIGH SCHOOL Additions, Blaine, WA

Blaine School District No. 503

13,900 SF, One Story Wood Frame Construction; Classrooms and Atria; 

Planning through Construction Documents; Cost: $900,000; 

Design and Project Architect with John Stewart Architects

 

LYNDEN HIGH SCHOOL Additions and Partial Remodel, Lynden, WA

Lynden School District No. 504

27,800 SF New, 5,100 SF Remodel, One story wood frame construction; 

Multiple buildings: Administrative areas, Classrooms, Laboratories, and Physical Education annex; 

Planning through Construction Documents; Cost: $2.2M; 

Project Architect with John Stewart Architects

 

NOOKSACK HIGH SCHOOL MULTI-USE CAFETORIUM, Nooksack, WA

Nooksack Valley School District No. 506

Masterplan; Planning Architect with John Stewart Architects

 

CARVER GYMNASIUM Reroof, Bellingham, WA

Western Washington University

Schematic Design through Construction Documents; Cost: $90,000; 

Project Architect with John Stewart Architects

1991

BLAINE EDUCATION PARK, Blaine, WA

Blaine School District No. 503

Masterplan; Planning Architect with John Stewart Architects

 

MERIDIAN HIGH SCHOOL, Bellingham, WA

Meridian School District No. 505

Masterplan; Planning Architect with John Stewart Architects

 

MERIDIAN HIGH SCHOOL GYMNASIUM, Bellingham, WA

Meridian School District No. 505

22,800 SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Support Spaces; 

Planning through Construction Documents; Cost: $1.4M; 

Design and Project Architect with John Stewart Architects

 

MERIDIAN HIGH SCHOOL MULTI-USE CAFETORIUM, Bellingham, WA

Meridian School District No. 505

15,000 SF one story masonry and steel Multi-Use Room, Theater, Stage, Kitchen, Lobby and Support Spaces; Planning through Construction Documents; Cost: $1.5M;  

Design and Project Architect with John Stewart Architects

 

SOLEDAD HIGH SCHOOL, Soledad, CA

Salinas School District

Masterplan; Principal and Planning Architect

1990

MT. BAKER JUNIOR/SENIOR HIGH SCHOOL, Deming, WA

Mt. Baker School District No. 507

22,800 SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Support Spaces; 

Planning through Construction Documents; Cost: $9.4 M; 

Planner and Project Architect with John Stewart Architects

1988

PG&E TRAINING CENTER Remodel, Stockton, CA

Pacific Gas and Electric Company

300 SF Spa Testing Lab remodel; Cost: $30,000; Principal and Design Architect

1981

PG&E WEATHERIZATION TRAINING CENTER Remodel, Stockton, CA

Pacific Gas and Electric Company

Cost: $90,000; Designer and Project Manager with Glen Mortensen Architects

 

WOODRUFF OCCUPATIONAL CENTER Solar Addition, Stockton, CA

Stockton Unified School District

13,000 SF Addition: 1 story masonry and steel construction with active solar heating system: 

New Business Classrooms and Commons; 

Programming through Construction Administration; Cost: $1.1 M;  

Designer and Project Manager with Glen Mortensen Architects  

1979

PG&E SOLAR TRAINING CENTER, Stockton, CA

Pacific Gas and Electric Company

6,400 SF Remodel, 1 story masonry and wood construction; 

Programming through Construction Administration; Cost: $1M; 

Designer and Project Manager with Glen Mortensen Architects

1978

DUEL VOCATIONAL INSTITUTE: DAIRY Remodel, Tracy, CA

California Penal System

Design through Construction Documents; Project Manager with Glen Mortensen Architects  

 

DUEL VOCATIONAL INSTITUTE: CANTEEN Remodel, Tracy, CA

California Penal System

Design through Construction Documents; Project Manager with Glen Mortensen Architects  

1975

WOODRUFF OCCUPATIONAL CENTER Addition, Stockton, CA

Stockton Unified School District

Masterplan and Conceptual Design; Planner and Project Manager with Glen Mortensen Architects  

1971

STUDENT HOUSING, Thermopolis, WY

Thermopolis Community College

Feasibility Study and Conceptual Design; Designer and Principal with Gideon Associates

1964

SWIMMING POOL EQUIPMENT & REFRESHMENT HOUSE, Linden, CA

Linden Union High School

New 1 story masonry and wood construction;  Planning through Construction Administration

Designer/Drafter while student at Linden Union High School.

 

LIBRARY Interiors, Linden, CA

Linden Union High School

New 1 story tilt-up concrete and wood construction; Space Planning and Interior Design;

Designer/Drafter while student at Linden Union High School.