| Secondary and Other School Projects | |
| 2002 |
ST. PAUL'S EPISCOPAL SCHOOL K-12 Facility, Northwest Site, Bellingham, WA Feasibility Reviews: Proposed Sites and Buildings; Conditional Use Application Approved; Principal Architect |
| 2001 |
ST. PAUL'S EPISCOPAL SCHOOL K-12 Facility, Meridian Site, Bellingham, WA Feasibility Reviews: Proposed Sites and Buildings; Principal Architect |
|
2002- 2000 |
FERNDALE HIGH SCHOOL FINE ARTS BUILDING Structural Rehabilitation, Ferndale, WA Ferndale
School District No. 502 Repair masonry deterioration and reface with water resistance material; Constructed; Cost: $190,000; Principal Architect |
|
1999 1997-
|
The
New BELLINGHAM HIGH SCHOOL, Bellingham, WA Bellingham School District No. 501 166,000 SF New Addition and Reconstruction of Historic Facility, Type II and Type VI Construction; One, two, and three story existing reinforced concrete structure, one and two story tilt-up concrete, masonry and steel new construction; Administrative Areas, Classrooms, Food Service and Student Commons, Laboratories, Library, Physical Education and Gymnasium Facilities, Site Development, Theater with full fly Stage, etc.; Planning through Construction Documents; Cost: $21M; Project Architect with ARA Architects |
|
1997 |
FERNDALE ALTERNATIVE HIGH SCHOOL BUILDING 500 Renovation, Ferndale, WA Ferndale School District No. 502 800 SF Reconstruction of one story masonry facility for Art and Vocational Classrooms; Programming through Construction Administration; Cost: $60,000; Project Architect with ARA Architects |
|
1994 |
BLAINE HIGH SCHOOL PERFORMING ARTS CENTER Addition, Blaine, WA Blaine School District No. 503 17,600 SF Two story masonry and steel Multi-Use Theater, Stage, Lobby and Support Spaces; Planning through Construction Documents; Cost:$1.7M; Planner and Project Architect with John Stewart Architects |
|
|
BLAINE
HIGH SCHOOL GYMNASIUM, Blaine, WA Blaine
School District No. 503 15,300 SF One and two story masonry and steel Gymnasium, Lobby and Support Spaces; Planning through Construction Documents; Cost: $1.2M; Design and Project Architect with John Stewart Architects |
|
1993 |
BLAINE ATHLETIC PARK, Blaine, WA Blaine School District No. 503 60 acre Athletic Facility: 2 baseball diamonds, 8 softball diamonds, 3 soccer/football fields, parking, and wetlands mitigation; Planning through Site/Civil Construction Documents; Cost: $1.1M; Bleachers, Concession, Interpretive Center and Maintenance structures; Masterplan; Design and Project Architect with John Stewart Architects |
|
|
NOOKSACK VALLEY JUNIOR/SENIOR HIGH SCHOOL Additions and Remodel, Nooksack, WA Nooksack Valley School District No. 506 34,500 SF Additions, 75,400 SF Remodel; Multiple buildings, One story wood frame, brick veneer, construction; Design and Project Manager/Architect with John Stewart Architects |
|
1992 |
BLAINE
HIGH SCHOOL Additions, Blaine, WA Blaine School District No. 503 13,900 SF, One Story Wood Frame Construction; Classrooms and Atria; Planning through Construction Documents; Cost: $900,000; Design and Project Architect with John Stewart Architects |
|
|
LYNDEN HIGH SCHOOL Additions and Partial Remodel, Lynden, WA Lynden School District No. 504 27,800 SF New, 5,100 SF Remodel, One story wood frame construction; Multiple buildings: Administrative areas, Classrooms, Laboratories, and Physical Education annex; Planning through Construction Documents; Cost: $2.2M; Project Architect with John Stewart Architects |
|
|
NOOKSACK HIGH SCHOOL MULTI-USE CAFETORIUM, Nooksack, WA Nooksack Valley School District No. 506 Masterplan; Planning Architect with John Stewart Architects |
|
|
CARVER GYMNASIUM Reroof, Bellingham, WA Western Washington University Schematic Design through Construction Documents; Cost: $90,000; Project Architect with John Stewart Architects |
|
1991 |
BLAINE EDUCATION PARK, Blaine, WA Blaine School District No. 503 Masterplan; Planning Architect with John Stewart Architects |
|
|
MERIDIAN HIGH SCHOOL, Bellingham, WA Meridian School District No. 505 Masterplan; Planning Architect with John Stewart Architects |
|
|
MERIDIAN HIGH SCHOOL GYMNASIUM, Bellingham, WA Meridian
School District No. 505 22,800
SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Planning through Construction Documents; Cost: $1.4M; Design and Project Architect with John Stewart Architects |
|
|
MERIDIAN HIGH SCHOOL MULTI-USE CAFETORIUM, Bellingham, WA Meridian School District No. 505 15,000
SF one story masonry and steel Multi-Use Room, Theater, Stage, Kitchen,
Lobby and Support Spaces;
Planning through
Construction Documents; Cost: $1.5M;
Design and Project Architect with John Stewart Architects |
|
|
SOLEDAD HIGH SCHOOL, Soledad, CA Salinas School District Masterplan; Principal and Planning Architect |
|
1990 |
MT. BAKER JUNIOR/SENIOR HIGH SCHOOL, Deming, WA Mt. Baker School District No. 507 22,800 SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Support Spaces; Planning through Construction Documents; Cost: $9.4 M; Planner and Project
Architect with John Stewart Architects |
|
1988 |
PG&E
TRAINING CENTER Remodel, Stockton, CA Pacific
Gas and Electric Company 300
SF Spa Testing Lab remodel; Cost: $30,000; Principal and Design Architect |
|
1981 |
PG&E
WEATHERIZATION TRAINING CENTER Remodel, Stockton, CA Pacific
Gas and Electric Company Cost:
$90,000; Designer and Project Manager with Glen Mortensen Architects |
|
|
WOODRUFF
OCCUPATIONAL CENTER Solar Addition, Stockton, CA Stockton
Unified School District 13,000 SF Addition: 1 story masonry and steel construction with active solar heating system: New Business Classrooms and Commons; Programming through
Construction Administration; Cost: $1.1 M;
Designer and Project Manager with Glen Mortensen Architects |
|
1979 |
PG&E SOLAR TRAINING CENTER, Stockton, CA Pacific
Gas and Electric Company 6,400 SF Remodel, 1 story masonry and wood construction; Programming through Construction Administration; Cost: $1M; Designer and Project Manager with
Glen Mortensen Architects |
|
1978 |
DUEL VOCATIONAL INSTITUTE: DAIRY Remodel, Tracy, CA California
Penal System Design
through Construction Documents; Project Manager with Glen Mortensen
Architects |
|
|
DUEL VOCATIONAL INSTITUTE: CANTEEN Remodel, Tracy, CA California Penal System Design through Construction
Documents; Project Manager with
Glen Mortensen Architects |
|
1975 |
WOODRUFF
OCCUPATIONAL CENTER Addition, Stockton, CA Stockton
Unified School District Masterplan
and Conceptual Design; Planner and Project Manager with Glen Mortensen
Architects |
|
1971 |
STUDENT
HOUSING, Thermopolis, WY Thermopolis
Community College Feasibility
Study and Conceptual Design; Designer and Principal with Gideon Associates |
|
1964 |
SWIMMING
POOL EQUIPMENT & REFRESHMENT HOUSE, Linden, CA Linden
Union High School New 1 story masonry and wood construction; Planning through Construction Administration; Designer/Drafter while student at Linden Union High
School. |
|
|
LIBRARY
Interiors, Linden, CA Linden
Union High School New 1 story tilt-up concrete and wood construction; Space Planning and Interior Design; Designer/Drafter while student at Linden Union High School. |