G i d e o n

A  r  c  h  i  t  e  c  t  s

 

Home

Projects

(Britax) Heath Tecna

North Washington Implement Company

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Industrial, Maintenance, Manufacturing, and Utility Projects

 

Fire Stations

1998

GRANITE FALLS FIRE STATION, Granite Falls, WA  

1 story wood frame construction; Planning Architect with ARA Architects

1997

HICKSON FIRE STATION Addition, Sedro Woolley, WA

Programming through Construction Documents; Project Architect with ARA Architects

 

Maintenance and Testing

1999

BELLINGHAM HERALD Reroof, Bellingham, WA

Project Architect with John Stewart Architects  

1996

HAGGEN/TOP FOODS, Various Locations, WA

Maintenance Reports and Recommendations; Principal Architect  

1991

CENTRAL GARAGE Materials Laboratory, Bellingham, WA  

Whatcom County Public Works

1 story wood frame lab addition; Programming through Construction Administration

Project Architect with John Stewart Architects

1965

MINERVA CENTER, Sharpe Army Depot, Lathrop, CA 

Schematic Design through Construction Documents;

Designer/Drafter with US Government (Student Intern Program)

 

Manufacturing

1991

TOSCO (Formerly BP) Refinery Office Additions, Ferndale, WA

Planning through Construction Documents; Project Architect with John Stewart Architects

1989

(BRITAX) HEATH TECNA CORPORATION, Bellingham, WA 

180,000 SF manufacturing facility and offices; 1 and 2 story concrete and steel construction;

Programming through Construction Documents; Project Architect with John Stewart Architects

1980

FAIRGROUNDS INDUSTRIAL PARK Remodel, Stockton, CA 

Masterplan and Image Design; Designer with Glen Mortensen Architects

 

LIQUID CARBONIC CORPORATION Remodel, Martinez, CA

Project Manager with Glen Mortensen Architects

1979

LIQUID CARBONIC CORPORATION OFFICE, Martinez, CA 

Design through Construction Documents; Project Manager with Glen Mortensen Architects

 

KUNG HAUS und FABRIC Addition and Remodel, Hosenruck, Switzerland

Schematic Design; Design Architect with Robert Itel Architects

1978

DUEL VOCATIONAL INSTITUTE: DAIRY Remodel, Tracy, CA 

California Penal System

Design through Construction Documents; Project Manager with Glen Mortensen Architects

1979-

1971

PANELIZED HOUSING UNITS, Midwest locations 

Designer/Job Captain with Mastercraft Homes/Knecht Industries

1970-

1971

MODULAR HOUSING UNITS, Midwest locations 

Designer/Job Captain with Mastercraft Homes/Knecht Industries

 

Utilities

 

PACIFIC GAS and ELECTRIC COMPANY

1988

TRAINING CENTER Remodel, Stockton, CA

Pacific Gas and Electric Company

300 SF Spa Testing Lab remodel; Cost: $30,000; Principal Architect

1987

OPERATIONS CENTER Remodel, Stockton, CA 

Masonry and wood frame Remodel; Principal Architect

 

STANISLAUS DIVISION OFFICE Remodel, Modesto, CA; Principal Architect

1986

JACKSON OFFICE Remodel and Renovation, Jackson, CA; Principal Architect

 

MODESTO GARAGE Addition, Modesto, CA; Principal Architect

 

MOTHER LODE OFFICE Remodel, Angels Camp, CAPrincipal Architect  

 

STANISLAUS DIVISION OPERATIONS CENTER, Modesto, CA

Conversion: 7,500 SF maintenance garage into Operations Offices, 

1 story masonry and wood frame construction; 

Programming through Construction Administration; Cost: $145,000; Principal Architect

 

STOCKTON DIVISION OFFICE Renovation, Stockton, CA 

20,000 SF interior remodel and renovation, 1 story concrete and steel construction; 

Programming through Construction Administration;  Cost: $380,000;  Principal Architect

 

STOCKTON DOWNTOWN OFFICE Remodel, Stockton, CAPrincipal Architect

 

STOCKTON OPERATIONS CENTER Remodel, Stockton, CAPrincipal Architect

1985

DELTA DISTRICT OFFICE Remodel, Stockton, CA; Principal Architect

 

MOTHER LODE DIVISION CENTER, Angels Camp, CA

16,000 SF 2 story wood frame office addition, 4,800 SF 1 story concrete and wood frame office remodel and renovation; 5,600 SF “Angels Hydro” maintenance building;  Access Bridge, and Parking; Estimated Cost: $2.5M; Programming through Building Permits; Office addition abandoned after Company reorganization;  Estimated Cost: $1.1M; Programming through Construction Administration; Office Remodel, Maintenance Building, Access Bridge and Parking; Cost: $1.4M; Principal Architect

 

PHOENIX FORBAY GARAGE, Phoenix Forbay, CAPrincipal Architect

 

STOCKTON DIVISION OFFICE Accessible Toilets Remodel, Stockton, CA; Principal Architect

 

TIGER CREEK LODGE Remodel, Tiger Creek, CA; Principal Architect

1984

GEREMIA POOLS OFFICE Remodel, Stockton, CA; Principal Architect

 

LODI OFFICE Remodel, Lodi, CA; Principal Architect

 

MOTHER LODE DIVISION CENTER Remodel, Angels Camp, CA; Principal Architect

 

STOCKTON DIVISION OFFICE Remodel, Stockton, CA; Principal Architect

 

TRACY OFFICE Remodel and Renovation, Tracy, CA; Principal Architect

1986 PACWEST TELECOMMUNICATIONS Remodel, Stockton, CA; Principal Architect
 

STOCKTON EAST WATER DISTRICT, Stockton, CA

Masterplan, Office, Schematic Design, Principal Architect

1981

SOLAR COLLECTOR Prototypes, Stockton, CA; Project Manager with Glen Mortensen Architects

 

WEATHERIZATION TRAINING CENTER Remodel, Stockton, CA

Pacific Gas and Electric Company

Cost: $90,000; Designer and Project Manager with Glen Mortensen Architect

 

PG&E SOLAR TRAINING CENTER, Stockton, CA

6,400 SF Remodel, 1 story masonry and wood construction; Programming through Construction Administration; Cost: $1M; Designer and Project Manager with Glen Mortensen Architects

 

Vehicle Sales and Maintenance

1998

NORTH WASHINGTON IMPLEMENT COMPANY, Lynden, WA  

1 and 2 story steel frame construction; Schematic Design through Construction Documents; Cost: $1.2M;  Project Architect with ARA Architects

1973

MAZDA DEALERSHIP, Rapid City, SD; Principal with Gideon Associates/Robert Sorensen Architect

 

Warehousing and Storage

1988

FLEMING HAYBARN, Farmer’s Feed Company, Stockton, CA

1,500 SF wood frame Historic Replication; Cost: $28,000; Principal Architect

1980

DELTA CABLE SUPPLY Addition and Remodel, Stockton, CA

Technical Assistance; Cost: $120,000; Review with Glen Mortensen Architects

1965

WAREHOUSE Remodel, Sharpe Army Depot, Lathrop, CA 

Schematic Design through Construction Documents;

Designer/Drafter with US Government (Student Intern Program)