Industrial, Maintenance, Manufacturing, and Utility Projects |
|
|
|
Fire Stations |
|
1998 |
GRANITE
FALLS FIRE STATION, Granite Falls, WA 1
story wood frame construction; Planning Architect with ARA Architects |
|
1997 |
HICKSON
FIRE STATION Addition, Sedro Woolley, WA Programming through Construction Documents; Project Architect with ARA Architects |
|
|
Maintenance and Testing |
|
1999 |
BELLINGHAM HERALD Reroof, Bellingham, WA Project
Architect with John Stewart Architects |
|
1996 |
HAGGEN/TOP
FOODS, Various Locations, WA Maintenance
Reports and Recommendations; Principal Architect |
|
1991 |
CENTRAL
GARAGE Materials Laboratory, Bellingham, WA Whatcom
County Public Works 1 story wood frame lab addition; Programming through Construction Administration; Project Architect with John Stewart Architects |
|
1965 |
MINERVA
CENTER, Sharpe Army Depot, Lathrop, CA
Schematic Design through Construction Documents; Designer/Drafter with US Government (Student Intern Program) |
|
|
Manufacturing |
|
1 |
TOSCO (Formerly BP) Refinery Office Additions, Ferndale, WA Planning through Construction Documents; Project Architect with John Stewart Architects |
|
1989 |
(BRITAX)
HEATH
TECNA CORPORATION, Bellingham, WA
180,000
SF manufacturing facility and offices; 1 and 2 story concrete and steel construction; Programming through Construction Documents; Project Architect with John Stewart Architects |
|
1980 |
FAIRGROUNDS
INDUSTRIAL PARK Remodel, Stockton, CA
Masterplan and Image Design; Designer with Glen Mortensen Architects |
|
|
LIQUID
CARBONIC CORPORATION Remodel, Martinez, CA Project
Manager with Glen Mortensen Architects |
|
1979 |
LIQUID
CARBONIC CORPORATION OFFICE, Martinez, CA
Design through Construction Documents; Project Manager with Glen Mortensen Architects |
|
|
KUNG
HAUS und FABRIC Addition and Remodel, Hosenruck, Switzerland Schematic Design; Design Architect with Robert Itel Architects |
|
1978 |
DUEL
VOCATIONAL INSTITUTE: DAIRY Remodel, Tracy, CA California
Penal System Design through Construction Documents; Project Manager with Glen Mortensen Architects |
|
1979- 1971 |
PANELIZED
HOUSING UNITS, Midwest locations
Designer/Job Captain with Mastercraft Homes/Knecht Industries |
|
1970- 1971 |
MODULAR
HOUSING UNITS, Midwest locations
Designer/Job Captain with Mastercraft Homes/Knecht Industries |
|
|
Utilities |
|
|
PACIFIC GAS and ELECTRIC COMPANY |
|
1988 |
TRAINING
CENTER Remodel, Stockton, CA Pacific
Gas and Electric Company 300 SF Spa Testing Lab remodel; Cost: $30,000; Principal Architect |
|
1987 |
OPERATIONS
CENTER Remodel, Stockton, CA Masonry and wood frame Remodel; Principal Architect |
|
|
STANISLAUS DIVISION OFFICE Remodel, Modesto, CA; Principal Architect |
|
1986 |
JACKSON OFFICE Remodel and Renovation, Jackson, CA; Principal Architect |
|
|
MODESTO GARAGE Addition, Modesto, CA; Principal Architect |
|
|
MOTHER
LODE OFFICE Remodel, Angels Camp, CA; Principal Architect |
|
|
STANISLAUS
DIVISION OPERATIONS CENTER, Modesto, CA Conversion: 7,500 SF maintenance garage into Operations Offices, 1 story masonry and wood frame construction; Programming through Construction Administration; Cost: $145,000; Principal Architect |
|
|
STOCKTON
DIVISION OFFICE Renovation, Stockton, CA
20,000 SF interior remodel and renovation, 1 story concrete and steel construction; Programming through Construction Administration; Cost: $380,000; Principal Architect |
|
|
STOCKTON DOWNTOWN OFFICE Remodel, Stockton, CA; Principal Architect |
|
|
STOCKTON
OPERATIONS CENTER Remodel, Stockton, CA; Principal Architect |
|
1985 |
DELTA DISTRICT OFFICE Remodel, Stockton, CA; Principal Architect |
|
|
MOTHER
LODE DIVISION CENTER, Angels Camp, CA 16,000 SF 2 story wood frame office addition, 4,800 SF 1 story concrete and wood frame office remodel and renovation; 5,600 SF “Angels Hydro” maintenance building; Access Bridge, and Parking; Estimated Cost: $2.5M; Programming through Building Permits; Office addition abandoned after Company reorganization; Estimated Cost: $1.1M; Programming through Construction Administration; Office Remodel, Maintenance Building, Access Bridge and Parking; Cost: $1.4M; Principal Architect |
|
|
PHOENIX FORBAY GARAGE, Phoenix Forbay, CA; Principal Architect |
|
|
STOCKTON DIVISION OFFICE Accessible Toilets Remodel, Stockton, CA; Principal Architect |
|
|
TIGER CREEK LODGE Remodel, Tiger Creek, CA; Principal Architect |
|
1984 |
GEREMIA POOLS OFFICE Remodel, Stockton, CA; Principal Architect |
|
|
LODI OFFICE Remodel, Lodi, CA; Principal Architect |
|
|
MOTHER LODE DIVISION CENTER Remodel, Angels Camp, CA; Principal Architect |
|
|
STOCKTON DIVISION OFFICE Remodel, Stockton, CA; Principal Architect |
|
|
TRACY OFFICE Remodel and Renovation, Tracy, CA; Principal Architect |
| 1986 | PACWEST TELECOMMUNICATIONS Remodel, Stockton, CA; Principal Architect |
|
STOCKTON
EAST WATER DISTRICT, Stockton, CA Masterplan, Office, Schematic Design, Principal Architect |
|
|
1981 |
SOLAR COLLECTOR Prototypes, Stockton, CA; Project Manager with Glen Mortensen Architects |
|
|
WEATHERIZATION
TRAINING CENTER Remodel, Stockton, CA Pacific Gas and Electric Company Cost: $90,000; Designer and Project Manager with Glen Mortensen Architect |
|
|
PG&E
SOLAR TRAINING CENTER, Stockton, CA 6,400 SF Remodel, 1 story masonry and wood construction; Programming through Construction Administration; Cost: $1M; Designer and Project Manager with Glen Mortensen Architects |
|
|
Vehicle Sales and Maintenance |
|
1998 |
NORTH
WASHINGTON IMPLEMENT COMPANY, Lynden, WA 1 and 2 story steel frame construction; Schematic Design through Construction Documents; Cost: $1.2M; Project Architect with ARA Architects |
|
1973 |
MAZDA DEALERSHIP, Rapid City, SD; Principal with Gideon Associates/Robert Sorensen Architect |
|
|
Warehousing and Storage |
|
1988 |
FLEMING
HAYBARN, Farmer’s Feed Company, Stockton, CA
1,500 SF wood frame Historic Replication; Cost: $28,000; Principal Architect |
|
1980 |
DELTA
CABLE SUPPLY Addition and Remodel, Stockton, CA Technical Assistance; Cost: $120,000; Review with Glen Mortensen Architects |
|
1965 |
WAREHOUSE
Remodel, Sharpe Army Depot, Lathrop, CA
Schematic Design through Construction Documents; Designer/Drafter with US Government (Student Intern Program) |