Elementary School Projects |
|
| 2002 |
ST. PAUL'S EPISCOPAL SCHOOL K-8 Facility, Northwest Site, Bellingham, WA Conversion
of 20,344 SF Office Building into a K-8; Phase One: Partial remodel
creating 12 classrooms, Commons, Play and Assembly / Chapel spaces;
Estimated cost: $400,000;
Conditional Use Application
Approved; Documents in Progress; |
| 2002 |
ST. PAUL'S EPISCOPAL SCHOOL K-12 Facility, Northwest Site, Bellingham, WA Feasibility Reviews: Proposed Sites and Buildings; Principal Architect |
| 2001 |
ST. PAUL'S EPISCOPAL SCHOOL K-12 Facility, Meridian Site, Bellingham, WA Feasibility Reviews: Proposed Sites and Buildings; Principal Architect |
|
|
YEW STREET ROAD ELEMENTARY SCHOOL SITE, Bellingham, WA Bellingham School District No. 501, 16 acre site; Feasibility
Study; Principal Architect |
|
ST. PAUL'S EPISCOPAL SCHOOL K-8 Facility, Bellingham, WA Feasibility Reviews: Proposed Sites and Buildings; Principal Architect |
|
|
2000 1999- |
ST. PAUL'S EPISCOPAL SCHOOL K-5 Facility, Bellingham, WA Feasibility Reviews: Proposed Sites and Buildings;
Principal Architect |
|
1996 1994- |
LITTLE EPISTLES PRE-SCHOOL &
ST. PAUL’S PRIMARY SCHOOL K-2 At ST. PAUL'S EPISCOPAL CHURCH
, Bellingham,
WA 21,000 SF Addition, 7,000 SF Remodel; Three story wood frame, brick
veneer construction; Administrative Offices, Chapel, Church School, used by Head Start during weekdays, Commercial Kitchen, Meeting and Work Rooms, Parish Hall including mini Gymnasium, Pre-K and K-2 Parochial School. Programming and Planning through Construction Documents and Contractor Negotiations, Designer and Project Architect with John Stewart Architects; Programming and Construction Administration; Cost: $1.9M; Principal Architect |
|
1994 |
BLAINE PRIMARY SCHOOL,
Blaine, WA Blaine School District No. 503 45,800 SF One story wood frame brick veneer construction;
Technical
Assistance and Site/Civil Design; |
|
1993 |
NOOKSACK VALLEY JUNIOR/SENIOR
HIGH SCHOOL Additions and Remodel, Nooksack, WA Nooksack Valley School District No. 506 34,500 SF Additions, 75,400 SF Remodel; Multiple buildings, One story wood frame, brick veneer, construction; Design and Project Manager/Architect with John Stewart Architects |
|
1992 |
NOOKSACK PRIMARY SCHOOL,
Nooksack, WA Nooksack Valley School District No. 506 34,200 SF, One story wood frame construction; Technical
Assistance and Site/Civil Design; Cost: $2.7M; |
|
|
SILVER BEACH ELEMENTARY SCHOOL
Additions & Remodel, Bellingham, WA Bellingham School District No. 501 49,400 SF Total: 36,500 SF Additions, 12,900 SF Remodel; One and two story wood frame, brick veneer, construction; Schematic Design
through Construction Documents;
Cost: $3.1M; Project Architect with John Stewart Architects |
|
1991 |
BLAINE EDUCATION PARK,
Blaine, WA Blaine School District No. 503 Masterplan; Planning Architect with John Stewart Architects |
|
|
BLAINE ELEMENTARY SCHOOL
Additions and Remodel, Blaine, WA Blaine School District No. 503 1 story masonry and wood frame construction; Programming
through Construction Documents; Project Architect with John Stewart Architects |
|
|
MERIDIAN
MIDDLE SCHOOL
Alterations and Renovation,
Bellingham, WA Meridian School District No. 505 One story masonry and wood frame construction; Technical
Assistance and Review Architect; Architect with John Stewart Architects |
|
|
MERIDIAN INTERMEDIATE SCHOOL,
Bellingham, WA Meridian School District No. 505 25,100 SF, One story wood frame construction; Technical
Assistance, Review Architect and Site/Civil Design; Cost: $1.6M; Architect with John Stewart Architects |
|
GENEVA
ELEMENTARY SCHOOL Additions and Remodel, Bellingham, WA Bellingham
School District No. 501 One
story wood frame construction; Schematic
Design through Construction Project Architect with John Stewart Architects |
|
|
1990 |
Mt.
BAKER JUNIOR/SENIOR HIGH SCHOOL, Deming, WA Mt. Baker School District No. 507 22,800 SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Support Spaces; Planning through Construction Documents; Cost: $9.4 M; Planner and Project Manager/Architect with John
Stewart Architects |
|
1982 1981-
|
MARTIN LUTHER KING ELEMENTARY SCHOOL
Remodel, Stockton, CA Stockton Unified School
District 1 story wood frame construction; Technical Assistance; Cost: $461,250; Partner with Mortensen/Gideon Architects |
|
1977 |
Interim
BARNETT-RANGE ELEMENTARY SCHOOL, Stockton, CA Lodi Unified School District Programming through Construction Administration; Cost: $320,000; Designer and Principal with Gideon Associates |
|
1976 |
HAZELTON ELEMENTARY SCHOOL, Stockton, CA Stockton Unified School District Schematic Design; Cost:
$1,400,000; Constructed 1977; |
|
|
ROOSEVELT ELEMENTARY SCHOOL,
Stockton, CA Stockton Unified School District Schematic Design through Construction Administration; Cost: $1,400,000; Designer and Project Manager with Glen Mortensen Architects |
|
1975 |
WEST RIVER CHILDREN'S
CENTER
School Remodel, Rockerville, SD South Dakota Children's Home Society Administration, School, and Maintenance Facilities; Schematic Design; Designer and Project Manager with Synago Corporation: Mickley/Pearson Architects |