Community Center Projects |
|
|
2000 |
LUMMI RESIDENT’S (McKenzie) CENTER, Lummi Reservation, Bellingham, WA 3,600
SF; Programming through Construction; |
|
1986 |
COMMUNITY
CENTER, Bakersfield, CA The
Salvation Army 19,
738 SF 1 Story and Playfields; Feasibility Study & Schematic
Design;
Principal Architect |
|
1983 |
COMMUNITY CENTER, Stockton, CA The
Salvation Army 10,368
SF Addition, 7,202 SF Remodel; Nave/Sanctuary, Multi-use Overflow, Multi-use
Classrooms, Multi-use Gymnasium, Activity Rooms, and Courtyards; 1 story
Masonry and wood frame construction; Programming and Planning through
Construction Administration; Cost: $750,000; Principal Architect with Mortensen / Gideon Architects |
|
|
PROJECTS WITH COMMUNITY USE SPACES Partial List of Church, Hotel / Motel, Restaurant, and School Projects |
| 2002 2001- |
HILLCREST CHAPEL Addition and Alterations, Bellingham, WA 25,506 SF 2 1/2 Story Steel Frame Addition; New Worship Space, Offices, and Education Center; 16,757 SF 2 Story Wood Frame Alterations, Convert Worship Space into Multi-Purpose Rooms and Remodel Education Space; Programming, Design through Construction Documents; Estimated Cost $3.1M; Under Construction; Design and Principal Architect |
| 2000 |
CIVIC FIELD COMPLEX Additions and Renovations, Bellingham, WA Western
Washington University and City of Bellingham Football/Soccer Stadium Additions and Renovations, Baseball Field Addition, New Events Center, Parking Lot Remodel and Renovation; Estimate: $10M; Planning and Conceptual Design; Design and Principal Architect (NBBJ Architects as Design Consultant) |
|
1999 1996-
|
ST.
HILDA'S and ST. PATRICK'S EPISCOPAL CHURCH, Edmonds, WA 5,200
SF Worship Space and Kitchen Addition, Remodel Worship space into Parish Hall,
|
|
1999 1997- |
The
New BELLINGHAM HIGH SCHOOL, Bellingham, WA Bellingham
School District No. 501 166,000
SF New and Reconstruction of Historic Facility, Type II and Type VI
Construction; Project Architect with ARA Architects |
|
1998 |
MYKONOS
GREEK RESTAURANT, Bellingham, WA 5,000
SF wood frame construction; Programming through Construction
Administration; Cost: $780,000; Design and Project Architect with ARA Architects |
|
1997 |
HICKSON
FIRE STATION Addition, Sedro Woolley, WA Programming through Construction Documents; Project Architect with ARA Architects |
|
1996 1994- |
Historic
ST. PAUL'S EPISCOPAL CHURCH Addition and Remodel, Bellingham, WA 21,000
SF Addition, 7,000 SF Remodel; Three story wood frame, brick veneer
construction; |
|
1994 |
BLAINE
HIGH SCHOOL PERFORMING ARTS CENTER Addition, Blaine, WA Blaine
School District No. 503 17,600 SF Two story masonry and steel Multi-Use Theater, Stage, Lobby and Support Spaces; Planning through Construction Documents; Cost:$1.7M; Planner
and Project Architect with John Stewart Architects |
|
|
BLAINE
HIGH SCHOOL GYMNASIUM, Blaine, WA Blaine
School District No. 503 15,300 SF One and two story masonry and steel Gymnasium, Lobby and Support Spaces; Planning
through Construction Documents; Cost: $1.2M; Design and Project Architect with John Stewart Architects |
|
|
BLAINE
PRIMARY SCHOOL, Blaine, WA Blaine
School District No. 503 Technical Assistance and Site/Civil Design; Architect with John Stewart Architects |
|
1993 |
NOOKSACK
VALLEY JUNIOR/SENIOR HIGH SCHOOL Additions and Remodel, Nooksack, WA Nooksack
Valley School District No. 506 34,500
SF Additions, 75,400 SF Remodel; Multiple buildings, One story wood frame,
brick veneer, construction; Programming through Construction
Administration; Cost: $3.9M; Design and Project Architect with John Stewart Architects |
|
1992 |
LYNDEN
HIGH SCHOOL Additions and Partial Remodel, Lynden, WA Lynden
School District No. 504 27,800 SF New, 5,100 SF Remodel, One story wood frame construction; Multiple buildings: Administrative areas, Classrooms, Laboratories, and Physical Education annex; Planning through Construction Documents; Cost: $2.2M; Project Architect with John Stewart Architects. |
|
|
NOOKSACK
HIGH SCHOOL MULTI-USE CAFETORIUM, Nooksack, WA Nooksack
Valley School District No. 506 Masterplan; Project Architect with John Stewart Architect |
|
|
NOOKSACK
PRIMARY SCHOOL, Nooksack, WA Nooksack
Valley School District No. 506 34,200 SF, One story wood frame construction; Technical Assistance and Site/Civil Design; Cost: $2.7M; Architect with John Stewart Architects. |
|
|
SILVER
BEACH ELEMENTARY SCHOOL Additions & Remodel, Bellingham, WA Bellingham
School District No. 501 36,500
SF Additions, 12,900 SF Remodel; One and two story wood frame, brick veneer,
construction; Schematic Design through Construction
Documents; Cost: $3.1M; Project Architect with John Stewart Architects. |
|
1991 |
BLAINE
ELEMENTARY SCHOOL Remodel, Blaine, WA Blaine
School District No. 503 1 story masonry and wood frame construction; Programming through Construction Documents; Project Architect with John Stewart Architects. |
|
|
GENEVA
ELEMENTARY SCHOOL Additions and Remodel, Bellingham, WA Bellingham
School District No. 501 One
story wood frame construction; Schematic Design through Construction
Project Architect with John Stewart Architects. |
|
|
MERIDIAN
HIGH SCHOOL GYMNASIUM, Bellingham, WA Meridian
School District No. 505 22,800
SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Planning through Construction
Documents; Cost: $1.4M; Design and Project Architect with John Stewart Architects |
|
|
MERIDIAN
HIGH SCHOOL MULTI-USE CAFETORIUM, Bellingham, WA Meridian
School District No. 505 15,000
SF one story masonry and steel Multi-Use Room, Theater, Stage, Kitchen, Lobby
and Support Spaces; Planning through Construction Documents; Cost: $1.5M; Design and Project Architect with John Stewart Architects |
|
|
MERIDIAN
INTERMEDIATE SCHOOL, Bellingham, WA Meridian
School District No. 505 25,100 SF, One story wood frame construction; Technical Assistance and Site/Civil Design; Cost: $1.6M; Architect with John Stewart Architects. |
|
|
SOLEDAD
HIGH SCHOOL, Soledad, CA Salinas
School District Masterplan; Principal Architect |
|
1990 |
The
New MT. BAKER JUNIOR/SENIOR HIGH SCHOOL, Deming, WA Mt.
Baker School District No. 507 22,800
SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Planning through Construction
Documents; Cost: $1.4M; Planner and Project Architect with John Stewart Architects |
|
|
SILVERCREST,
Stockton, CA The
Salvation Army Phase II: Schematic Design; Principal Architect |
|
1989 |
BELLINGHAM
CRUISE/ALASKA FERRY TERMINAL, Bellingham, WA Construction Administration; Architect with John Stewart Architects |
|
1988 |
PG&E
TRAINING CENTER, Remodel, Stockton, CA Pacific
Gas and Electric Company 300 SF Spa Testing Lab remodel; Cost: $30,000; Principal Architect |
|
|
SILVERCREST
Phase One, Stockton, CA The
Salvation Army Schematic
Design; Principal Architect |
|
1988 1987- |
Historic
ST. MARY'S CATHOLIC CHURCH, Stockton, CA 8,628
SF Restoration and Rehabilitation, 1.5 Story Brick Construction, Masterplanning through Construction Documents; Phase 1 Restoration:
Construction Estimated Cost: $276,000; Phase 1 Cost: $38,226; Principal Architect |
|
1987 |
SILVERCREST
Elderly Housing, Stockton, CA The
Salvation Army 300
Unit Elderly Care Complex, Phased Construction; North
Building: 100 units, common and support areas, 50 space parking garage; South Building: 200 units, 40 bed nursing floor, common and support areas, 16,000 SF Ground Floor Commercial space; Parking Garage: Historic “Studebaker Garage”: 30,000 SF 3 story reinforced concrete construction, conversion to 50 space parking garage; Chapel, and Gardens; Two 9 ˝ story masonry and concrete structures; Feasibility Study and Conceptual Design; Estimated Cost: $17-22M; Estimated Completion: 10 years; Principal Architect |
|
|
FIRST
CHRISTIAN CHURCH, Stockton, CA 3,000
SF conversion of 1 story wood frame office building into Nave/Sanctuary, and Church Offices;
Programming and Planning through Cost: $80,000; Principal Architect |
|
|
PG&E
STOCKTON DIVISION OFFICE Renovation, Stockton, CA Pacific
Gas and Electric Company 20,000 SF interior remodel and renovation, 1 story concrete and steel construction; Programming through Construction Administration; Cost: $380,000; Principal Architect |
|
1985 |
Historic
FIRST CONGREGATIONAL CHURCH, Stockton, CA Toilets
and Ramp Accessibility Addition and Remodel; Constructed; Cost: $15,000; Principal Architect |
|
|
PG&E
MOTHER LODE DIVISION CENTER, Angels Camp, CA Pacific
Gas and Electric Company 16,000 SF 2 story wood frame office addition, 4,800 SF 1 story concrete and wood frame office remodel and renovation, 5,600 SF “Angels Hydro” maintenance building, Access Bridge, and Parking; Estimated Cost: $2.5M; Programming through Building Permits; Office addition abandoned after Company reorganization; Estimated Cost: $1.1M; Programming through Construction Administration; Office Remodel, Maintenance Building, Access Bridge and Parking; Cost: $1.4M; Principal Architect |
|
|
STOCKTON FAMILY SHELTER, Stockton, CA Principal Architect |
|
1984 |
LDS
FIRST AND SECOND WARD CHURCH, Stockton, CA Re roof; Construction Documents; Technical Architect with Mortensen/Gideon Architects |
|
|
LDS
CHURCH, Brentwood, CA 1 story wood frame brick veneer construction; Technical Assistance; Cost: $1.1M; Review Architect with Mortensen/Gideon Architects |
|
1982 1981- |
MARTIN
LUTHER KING ELEMENTARY SCHOOL Remodel, Stockton, CA Stockton
Unified School District 1
story wood frame construction; Technical Assistance; Cost: $461,250; Review
Architect with Glen Mortensen Architects |
|
1981 |
BANK
OF AMERICA Remodel, Lincoln Village Branch, Stockton, CA 1 and 2 story masonry and wood frame construction; Design through Construction Documents; Cost: $493,066; Design and Project Manager with
Glen Mortensen Architects |
|
|
FIRST
INTERSTATE BANK, Weberstown Branch, Stockton, CA 5,000
SF 1 story wood frame, stucco clad construction; Planning through Construction
Administration; Cost: $423,390; Project Manager with Glen Mortensen
Architects |
|
|
LDS
CHURCH Remodel, Elk Grove, CA 1
story wood frame construction; Design Development and Construction
Documents; Cost: $224,932; Project Manager with Glen Mortensen, Architect |
|
|
LDS
FIFTH and SIXTH WARD CHURCH Remodel, Sacramento, CA Design
Development and Construction Documents; Project Manager with Glen
Mortensen, Architects |
|
|
LDS
SOUTH STAKE CHURCH Remodel, Sacramento, CA 1
story wood frame construction; Technical Assistance; Cost: $61,463; Review with Glen Mortensen, Architects |
|
|
OAK
PARK ICE SKATING ARENA Remodel, Stockton, CA Schematic
Design through Construction Administration; Project Manager with Glen Mortensen Architects |
|
|
PG&E
WEATHERIZATION TRAINING CENTER, Remodel, Stockton, CA Pacific Gas and Electric Company Cost: $90,000; Designer and Project Manager with Glen Mortensen Architect |
|
|
WOODRUFF
OCCUPATIONAL CENTER Solar Addition, Stockton, CA Stockton
Unified School District 13,000 SF Addition: 1 story masonry and steel construction with active solar heating system: New Business Classrooms and Commons; Programming through Construction Administration; Cost: $1.1M; Designer and Project Manager with Glen
Mortensen Architects |
|
1981 1980- |
OPERATING
ENGINEERS Office Building and Union Hall, Stockton, CA 1 and 2 story wood frame, masonry veneer construction; Programming through Construction Administration; Cost: $567,692; Project Manager with Glen Mortensen Architects |
|
1980 |
BANK
OF AMERICA, Wilson Way Agri-Center Branch, Stockton, CA 14,000 SF 1 and 2 story wood frame, stucco clad construction; Design Development through Construction Administration; Cost: $981,006; Principal with
Mortensen/Gideon Architects |
|
|
STOCKTON
SAVINGS AND LOAN, Pacific Avenue Branch, Stockton, CA 1
story wood frame, masonry veneer construction; Technical Assistance; Cost:
$351,313; Review
with Glen Mortensen Architects |
|
|
STOCKTON
SAVINGS AND LOAN Addition, Robinhood Branch, Stockton, CA 1
story masonry and wood construction; Technical Assistance; Cost: $116,771; Review with Glen Mortensen Architects |
|
|
LDS
CHURCH Addition, Lodi, CA 1
story wood frame brick veneer construction; Technical Assistance; Cost:
$368,000; Review with Glen Mortensen Architects |
|
1979 |
LDS
CHURCH, Modesto, CA 1
story wood frame brick veneer construction; Technical Assistance; Cost:
$492,516; Review with Glen Mortensen Architects |
|
|
LDS
FIRST and SECOND WARD CHURCH Addition and Remodel, Stockton, CA Design
Development and Construction Documents; Project Manager with Glen Mortensen Architects |
|
|
PG&E
SOLAR TRAINING CENTER, Stockton, CA Pacific
Gas and Electric Company 6,400
SF Remodel, 1 story masonry and wood construction; Programming through
Construction Administration; Cost: $1M; Designer and Project Manager
with Glen Mortensen Architects |
|
1978 |
LDS
FIRST WARD CHURCH, Stockton, CA Design
Development and Construction Documents; Project Manager with Glen Mortensen Architects |
|
|
LINCOLN
PRESBYTERIAN CHURCH Remodel, Stockton, CA Design Development and Construction Documents; Job Captain with Glen Mortensen Architects |
|
|
NUGGET
FOODS, Nugget Distributors, Inc., Passive Solar Corporate Offices,
Stockton, CA 16.000 SF 1story masonry and wood frame construction; Design Development through Construction Documents; Cost: $850,000; Job Captain with Glen Mortensen
Architects |
|
1977 |
Interim
BARNETT-RANGE ELEMENTARY SCHOOL, Stockton, CA Lodi
Unified School District Programming
through Construction Administration; Cost: $320,000; Principal with Gideon Associates |
|
1976 |
BANK
OF AMERICA Lincoln Village Branch Remodel, Stockton, CA Designer and Project Manager with Glen Mortensen Architects |
|
|
HAZELTON
ELEMENTARY SCHOOL, Stockton, CA Stockton
Unified School District Schematic
Design; Cost: $1,400,000; Constructed 1977; |
|
|
ROOSEVELT
ELEMENTARY SCHOOL, Stockton, CA Stockton
Unified School District Schematic
Design through Construction Administration; Cost: $1,400,000; Designer and Project Manager with Glen Mortensen Architects |
|
1975 |
WOODRUFF
OCCUPATIONAL CENTER Addition, Stockton, CA Stockton
Unified School District Masterplan and Conceptual Design; Project Manager with Glen Mortensen Architects |
|
1974 |
ALL
FAITHS CHAPEL, Redfield, SD Construction Administration; Job Captain with Synago Corporation Architects |
|
|
FIRST
CONGREGATIONAL CHURCH Fellowship Hall Addition, Redfield, SD Design
Development through Construction Administration; Job Captain with Synago Corporation Architects |
|
1973 |
CATHOLIC
CHURCH, Wall, SD Construction Documents; Draftsman with Synago Corporation Architects |
|
|
KING'S
INN OF TORRINGTON, Torrington, WY 32,000 SF 1 and 2 story masonry and wood frame construction; 40 units, manager's unit, restaurant, lounge, 200 person banquet facility, indoor swimming pool, and boutique shops; Programming through Construction
Administration; Cost:
$950,000; Designer and Principal with Gideon Associates/Robert Sorensen Architect |
|
1972 |
HACIENDA
MOTEL, Gordon, NE 15,300 SF 3 story masonry and wood frame construction, 23 units, manager's unit, restaurant, lounge, 75 person banquet facility; Programming through Construction Administration; Cost: $450,000; Designer and Principal with Gideon Associates/Hupfer Architect |
|
|
KING'S
INN Addition and Remodel, Pierre, SD 43,200
SF Addition: 3 story masonry and prestressed concrete construction; 61 units, 3rd
floor 1,000 person banquet facility with full kitchen; 2,400 SF Restaurant and
Lobby Remodel; Programming through Construction Administration; Cost:
$1.3M; Designer
and Principal with Gideon Associates/John Hupfer Architect |
|
|
TRAVELODGE,
Rapid City, SD Feasibility Study and Schematic Design; Principal with Gideon Associates |
|
1964 |
LIBRARY
Interiors, Linden, CA Linden
Union High School New 1 story tilt-up concrete and wood construction; Space Planning and Interior Design; Designer/Drafter while student at Linden Union High School. |